>Read More

Solar power plant of 2MW - December, 2014

A 2MW solar power plant was installed in Parsdorf, Germany. This project is done in a cooperation with a German leader installations implementer. The works were carried out for 3 weeks. Our company was represented by three specialists again. Till today this is the biggest solar power system, which we took part in the construction.

>Read More

Installation of 300kW power plant system - August, 2014.

A 300kW solar power plant was installed in Biberach, Germany. This project is done in a cooperation with the German leader implementer of the installations. The works were carried out for 2 weeks. Our company was represented by three specialists. This is the first foreign solar power system, which we took part in the construction.

>Read More

Solar power plant of 30kW - winter of 2013/2014

The first major project of Energo Balaž Ltd is a solar power system installation in the center of Palic, Serbia. This is the first system in the municipilaty of Subotica that does not work in island mode, but it gives the extra power to the public distribution. This 30kW photovoltaic plant consists of two SMA invertors of 15kW and 132 panels. It was implemented in the winter of 2013/2014. Our company was represented by three >Read More

>Read More

Battery backup systems

We deal with installing small systems, which are connected to accumulators and we also install domestic hot water systems, both in island mode. These services are typically required for vacation or weekend homes where the power supply is problematic. If you have such problems, please contact us!