Installation of 300kW power plant system - August, 2014.

A 300kW solar power plant was installed in Biberach, Germany. This project is done in a cooperation with the German leader implementer of the installations. The works were carried out for 2 weeks. Our company was represented by three specialists. This is the first foreign solar power system, which we took part in the construction.